1 green, 3 brown.
Wow. Finished some demolition in house - guest bathroom is gutted. Getting the bath tub out was how should I put this... it was a mother fscker. 300 pounds of porcelain covered cast iron that jst fit the space. And the damn rodent droppings under it. I'm really glad to be getting this work done - floor was rotted out completely (partially rotted when I bought the house and then 5 more years of kids splashing didn't help.
Solid 3/4 tongue and groove underlayment. Scabbing onto rotted joists. Schedule 40 drain replacing cast iron (whiskey tango foxtrot - cast iron drains?)
Floor will be 12 inch italian ceramic tile which should preclude future water damage a bit better than the linoleum.
Tuesday, February 12, 2008
Subscribe to:
Post Comments (Atom)
April 10 2 White, 2 Green 3 day: 4W, 2B, 6G 7 day: 9W, 4B, 13G 21 day: 29W, 10B, 42G (6 dozen + 8 in 3 weeks) 28 day: 38W, 14B, 56G W:2,0,2,...
-
March 31 2 White, 2 Green 3 day: 4W, 1B, 7G 7 day: 10W, 3B, 154G 21 day: 28W, 9B, 41G (6 dozen + 6 in 3 weeks) 28 day: 35W, 10B,51G W:2,0,...
-
April 10 2 White, 2 Green 3 day: 4W, 2B, 6G 7 day: 9W, 4B, 13G 21 day: 29W, 10B, 42G (6 dozen + 8 in 3 weeks) 28 day: 38W, 14B, 56G W:2,0,2,...
-
March 2 1 white, 1 brown, 2 green There had been 2 white layers and 2 green until now. Occasional 4 egg days, but mostly 1 or 2 egg days. ...
No comments:
Post a Comment